ZHCUDB1A July 2025 – September 2025
### TX Tone Out
## Send 10 MHz Tone to TX AB
amplA = -10 #band 0 amp in dBfs
freqA = 10 #band 0 freq in MHz
amplB = -10 #band 1 amp
freqB = 10 #band 1 freq
AFE.selectCH(2,0)
AFE.FPGA.sendSingleTone(0,freqA,amplA,freqB,amplB)
## Send 10 MHz Tone to TX CD
amplA = -10 #band 0 amp
freqA = 10 #band 0 freq
amplB = -10 #band 1 amp
freqB = 10 #band 1 freq
AFE.selectCH(2,2)
AFE.FPGA.sendSingleTone(0,freqA,amplA,freqB,amplB)
圖 4-4 在 7.2GHz NCO 且振幅為 –10dBFS 時(shí)的典型 TXDAC 10MHz 單頻性能