ZHCSJC6F March 2016 – June 2018 TDA2E
PRODUCTION DATA.
請(qǐng)參考 PDF 數(shù)據(jù)表獲取器件具體的封裝圖。
CAUTION
The I/O timings provided in this section are valid only if signals within a single IOSET are used. The IOSETs are defined in Table 7-136.